Legacy of Excellence: Our Projects Tell the Story
The solutions and services offered bring quantitative technical and economic benefits to projects engaged.


Client
Private Oil and Gas Company
Feasibility study, EIA, Detailed design and Implementation of 6 x 1500 BBLD mini modular refineries
2022
2019
Commissioning of 10,000 BBLD modular refinery
Construction of 10,000 BBLD modular refinery
2018
2017
Feasibility study, EIA, Detailed design and Implementation of 10,000 BBLD modular refinery
Commissioning of 20,000 BBLD modular refinery
2016
Construction of 20,000 BBLD modular refinery
2015
Feasibility study, EIA, Detailed design and Implementation of 20,000 BBLD modular refinery






Client
Federal Ministry of Power


2015
Renewable resources study of Hydro Power Generation Potential for the whole of Nigeria
Client
Winners Power Garden Ltd Hydro-Power Plant


2014
Hydro-Electric Power Plant and Dam on the Okura River in Dekina Local Government Area of Kogi State.
Detailed Engineering Design including:-
• Site layout Design.
• Civil design
• Structural design
• Electrical design
• Mechanical design
• Detailed Equipment List
• Construction Costs
• Construction Timeline.
Ongoing...
Client
Delta State Refinery, LPG, Urea, Power and Water


2014
Feasibility Study, Environmental Impact Assessment and Evacuation Study for 200,000 BBLD Modular Refinery, Tank Farm, LPG, UREA Power Generation and Water Treatment Plant
Ongoing...
Client
Bishorps LPG and Urea Plant


2014
Feasibility Study and Environmental Impact Assessment for 200TPDLPG and UREA Plant
Ongoing...
Client
Siddler Dynamic Engineering Limited / KRPC


2013
Steam Turbine Control System Upgrade Project.
• Redesign placement of panels and control desk location.
• Installation of new Triconix-based turbo machinery control system equipment.
• Core drilling for cable access and cable routing
• Cable tray and cable installation.
• Testing and dry commissioning of the completed system.
• Commissioning.
• As build drawings
• Site Acceptance Tests (SAT) and final handover.
Client
Firstgate Business Intermediaries Limited. ABUJA


2013
Project Management and Consultancy services on several major construction and urban development projects including:-
• ABUJA City Centre
• Marco Polo Chinese Restaurant, Sports Bar, and Bowling Alley.
• Nigerian Workers Income Housing Scheme Project (130,000 houses and infrastructure)
Ongoing...
Client
Nasarawa Energy Company Ltd. (NASENCO)


2013
Re-design and Completion/Rehabilitation of Farin Ruwa Hydropower Station in Nasarawa State to allow an increase in generation capacity from 20mW to 30mW Involving:
• Upgrade and increase the height of the Dam structure.
• Repair and extend/rehabilitate Water Intake and Penstock structures.
• Redesign and Construction of new Spillways to meet the latest safety regulations.
• Relocate and construction of Generator House.
• Upgrade of Generation and Distribution equipment.
• Commission complete facility.
• Operation and Maintain
Ongoing...
Client
Badagry Refinery and Jetty


2013
Feasibility Study, Environmental Impact Assessment and Evacuation Study for 150,000 BBLD Modular Refinery and Tank Farm
Ongoing...
Client
Water and Waste Water Plants with Technical Partners


2013
• Kaduna State Water Board, Sobo Water Supply Project
• Plateau State Water Supply Project • Kaduna State Water Board, Zaria Dam Project
• Kano W.R.E.C.A. Challawa Water Treatment Plant MODULAR SYSTEMS Page 14 of 24
• Kaduna North Water Rehabilitation Project
• Ikom Water Supply Project
• Cross River State Water Board - Water Distribution System
• Enugu Water Board
• Jimeta - Yola (Emergency) Water Supply Project
• Funtua Water Supply Project
Ongoing...
Client
Ogoni Refinery and Import Export Terminal


2012-2013
Feasibility Study, Environmental Impact Assessment and Evacuation Study for 100,000 BBLD Modular Refinery and Tank Farm
Ongoing...
Client
Winners Power/ Magnifique


2012-2013
Hydro-Electric Power Plant and Dam on the Okura River in Dekina Local Government Area of Kogi State. Feasibility Study and Report including:-
• Site Surveys.
• Geophysical Surveys.
• Climate research.
• Overall Conceptual design.
• Provisional Equipment List.
• Provisional Manning Levels.
• Estimated Construction Costs.
• Provisional Timeline.
• Environmental Impact Assessment (EIA) review and update.
Ongoing...
Client
Ministry of Niger Delta / Mediterranean Engineering Services Ltd.


2012
Dredging and Stockpiling Project - Andoni
• Dredging of First Phase (300,000 cubic meters) sand for fill and shore protection project. Total sand requirement for project is 1,000,000 cubic meters.
Ongoing...
Client
SEPTA Energy


2011
Cathodic Protection EPC
• FEED & Detailed Design
• Calculations
• MTO
• Supply of Materials/Installation/Commission
Ongoing...
Client
ADDAX/ACM Knock Adoon FPSO


2010-2011
ISO 9001:2008 Certification
• Audit of existing system
• Identification of shortfalls
• Preparation of required missing documentation
• Corrective Action
• Findings Report
• Certification
Flange Face Refacing
• Project Management
• Inspection Services
• Identification of Sub Sea PLEM
• Recommendation for Repairs
• Leak Test
• Re Commissioning
• Certification
Ongoing...
Client
Port Harcourt Refining and Petrochemicals Company (PHRC)


2010
Black Start Generators
• Project Management
• Audit and Review of Existing System
• Identification of Faults and Inconsistencies
• Recommendations for Rehabilitation
• Corrective Actions
• Re-commissioning
Client
Kaduna Refining & Petrochemicals Company (KRPC).
2008-2009
Distributed Control System (DCS), Instrumentation, and Associated Electrical Systems Consultancy.
• Audit of Existing Plant DCS Systems (Software and Hardware).
• Audit of Existing Plant E&I Systems
• Site E&I Specification
• Site DCS Specification
• User Requirement Specifications (URS)
• Request For Quotation (RFQ)
2007-2008
Site Survey of Steam Power Plant in Preparation for Turbine Control System Upgrade
• Audit of Existing System (Electro-Mechanical)
• Review As-Built Drawings
• Design of New Control System Interfaces
• Designing of Cable Routes and Cabinet Locations
• Design Modifications to Existing Control Room
• Feasibility Study (Interfacing with existing Protection Relays)
Client
Dresser Kellogg Energy Services. SPDC Project OBIGBO Associated Gas Gathering Project
2003-2005
Obigbo AGG Project
• Engineering Manpower
• Project Management
• DCC Management
• AutoCAD Design, AS-Built • Weld Maps
• Reprographics and Engineering Drawing Documentation
• Project Design Manuals
• Operations & Maintenance Manuals
• As-Built Documentation


Client
ELF Petroleum Nig. Ltd. Port Harcourt
2000-2003
CC Upgrade & Training
• Document Production, Large Format Copying and Scanning.
• Manpower Training (MicroStation, AutoCAD, GIS, Basic Topology)
• Computerisation of Facility Manual Drawings into Electronic Soft Copies.


Client
B+B Gas and Oil Services (NIG) Ltd. Port Harcourt.
1998-2000
Soku Pipeline Project
• AutoCAD of As-Build Results of the SOKU Gas Pipeline Project.


Client
ALCON/SHELL
1995-1998
Design and Preparation of As-Built Drawing of the following SHELL Flow Stations Upgrade:-
• UBIE
• IMO River 1 & 2
• Elelenwo • Assa
• Umuechem
• Updating and Modification of P&ID, G A’s, Equipment Layouts and Isometrics. Civil & Structural
• Hazardous Area Classification


Client
ABB Lummus Global/Shell
1993-1995
Transformation of Design Data to AutoCAD and Archiving
• Process Consultancy Services
• Reprographics
• Material Supply
• Supply of Manpower
• Project Management

