Legacy of Excellence: Our Projects Tell the Story

The solutions and services offered bring quantitative technical and economic benefits to projects engaged.

Client

Private Oil and Gas Company

Feasibility study, EIA, Detailed design and Implementation of 6 x 1500 BBLD mini modular refineries

2022

2019

Commissioning of 10,000 BBLD modular refinery

Construction of 10,000 BBLD modular refinery

2018

2017

Feasibility study, EIA, Detailed design and Implementation of 10,000 BBLD modular refinery

Commissioning of 20,000 BBLD modular refinery

2016

Construction of 20,000 BBLD modular refinery

2015

Feasibility study, EIA, Detailed design and Implementation of 20,000 BBLD modular refinery

Client

Federal Ministry of Power

2015

Renewable resources study of Hydro Power Generation Potential for the whole of Nigeria

Client

Winners Power Garden Ltd Hydro-Power Plant

2014

Hydro-Electric Power Plant and Dam on the Okura River in Dekina Local Government Area of Kogi State.

Detailed Engineering Design including:-

• Site layout Design.

• Civil design

• Structural design

• Electrical design

• Mechanical design

• Detailed Equipment List

• Construction Costs

• Construction Timeline.

Ongoing...

Client

Delta State Refinery, LPG, Urea, Power and Water

2014

Feasibility Study, Environmental Impact Assessment and Evacuation Study for 200,000 BBLD Modular Refinery, Tank Farm, LPG, UREA Power Generation and Water Treatment Plant

Ongoing...

Client

Bishorps LPG and Urea Plant

2014

Feasibility Study and Environmental Impact Assessment for 200TPDLPG and UREA Plant

Ongoing...

Client

Siddler Dynamic Engineering Limited / KRPC

2013

Steam Turbine Control System Upgrade Project.

• Redesign placement of panels and control desk location.

• Installation of new Triconix-based turbo machinery control system equipment.

• Core drilling for cable access and cable routing

• Cable tray and cable installation.

• Testing and dry commissioning of the completed system.

• Commissioning.

• As build drawings

• Site Acceptance Tests (SAT) and final handover.

Client

Firstgate Business Intermediaries Limited. ABUJA

2013

Project Management and Consultancy services on several major construction and urban development projects including:-

• ABUJA City Centre

• Marco Polo Chinese Restaurant, Sports Bar, and Bowling Alley.

• Nigerian Workers Income Housing Scheme Project (130,000 houses and infrastructure)

Ongoing...

Client

Nasarawa Energy Company Ltd. (NASENCO)

2013

Re-design and Completion/Rehabilitation of Farin Ruwa Hydropower Station in Nasarawa State to allow an increase in generation capacity from 20mW to 30mW Involving:

• Upgrade and increase the height of the Dam structure.

• Repair and extend/rehabilitate Water Intake and Penstock structures.

• Redesign and Construction of new Spillways to meet the latest safety regulations.

• Relocate and construction of Generator House.

• Upgrade of Generation and Distribution equipment.

• Commission complete facility.

• Operation and Maintain

Ongoing...

Client

Badagry Refinery and Jetty

2013

Feasibility Study, Environmental Impact Assessment and Evacuation Study for 150,000 BBLD Modular Refinery and Tank Farm

Ongoing...

Client

Water and Waste Water Plants with Technical Partners

2013

• Kaduna State Water Board, Sobo Water Supply Project

• Plateau State Water Supply Project • Kaduna State Water Board, Zaria Dam Project

• Kano W.R.E.C.A. Challawa Water Treatment Plant MODULAR SYSTEMS Page 14 of 24

• Kaduna North Water Rehabilitation Project

• Ikom Water Supply Project

• Cross River State Water Board - Water Distribution System

• Enugu Water Board

• Jimeta - Yola (Emergency) Water Supply Project

• Funtua Water Supply Project

Ongoing...

Client

Ogoni Refinery and Import Export Terminal

2012-2013

Feasibility Study, Environmental Impact Assessment and Evacuation Study for 100,000 BBLD Modular Refinery and Tank Farm

Ongoing...

Client

Winners Power/ Magnifique

2012-2013

Hydro-Electric Power Plant and Dam on the Okura River in Dekina Local Government Area of Kogi State. Feasibility Study and Report including:-

• Site Surveys.

• Geophysical Surveys.

• Climate research.

• Overall Conceptual design.

• Provisional Equipment List.

• Provisional Manning Levels.

• Estimated Construction Costs.

• Provisional Timeline.

• Environmental Impact Assessment (EIA) review and update.

Ongoing...

Client

Ministry of Niger Delta / Mediterranean Engineering Services Ltd.

2012

Dredging and Stockpiling Project - Andoni

• Dredging of First Phase (300,000 cubic meters) sand for fill and shore protection project. Total sand requirement for project is 1,000,000 cubic meters.

Ongoing...

Client

SEPTA Energy

2011

Cathodic Protection EPC

• FEED & Detailed Design

• Calculations

• MTO

• Supply of Materials/Installation/Commission

Ongoing...

Client

ADDAX/ACM Knock Adoon FPSO

2010-2011

ISO 9001:2008 Certification

• Audit of existing system

• Identification of shortfalls

• Preparation of required missing documentation

• Corrective Action

• Findings Report

• Certification

Flange Face Refacing

• Project Management

• Inspection Services

• Identification of Sub Sea PLEM

• Recommendation for Repairs

• Leak Test

• Re Commissioning

• Certification

Ongoing...

Client

Port Harcourt Refining and Petrochemicals Company (PHRC)

2010

Black Start Generators

• Project Management

• Audit and Review of Existing System

• Identification of Faults and Inconsistencies

• Recommendations for Rehabilitation

• Corrective Actions

• Re-commissioning

Client

Kaduna Refining & Petrochemicals Company (KRPC).

2008-2009

Distributed Control System (DCS), Instrumentation, and Associated Electrical Systems Consultancy.

• Audit of Existing Plant DCS Systems (Software and Hardware).

• Audit of Existing Plant E&I Systems

• Site E&I Specification

• Site DCS Specification

• User Requirement Specifications (URS)

• Request For Quotation (RFQ)

2007-2008

Site Survey of Steam Power Plant in Preparation for Turbine Control System Upgrade

• Audit of Existing System (Electro-Mechanical)

• Review As-Built Drawings

• Design of New Control System Interfaces

• Designing of Cable Routes and Cabinet Locations

• Design Modifications to Existing Control Room

• Feasibility Study (Interfacing with existing Protection Relays)

Client

Dresser Kellogg Energy Services. SPDC Project OBIGBO Associated Gas Gathering Project

2003-2005

Obigbo AGG Project

• Engineering Manpower

• Project Management

• DCC Management

• AutoCAD Design, AS-Built • Weld Maps

• Reprographics and Engineering Drawing Documentation

• Project Design Manuals

• Operations & Maintenance Manuals

• As-Built Documentation

Client

ELF Petroleum Nig. Ltd. Port Harcourt

2000-2003

CC Upgrade & Training

• Document Production, Large Format Copying and Scanning.

• Manpower Training (MicroStation, AutoCAD, GIS, Basic Topology)

• Computerisation of Facility Manual Drawings into Electronic Soft Copies.

Client

B+B Gas and Oil Services (NIG) Ltd. Port Harcourt.

1998-2000

Soku Pipeline Project

• AutoCAD of As-Build Results of the SOKU Gas Pipeline Project.

Client

ALCON/SHELL

1995-1998

Design and Preparation of As-Built Drawing of the following SHELL Flow Stations Upgrade:-

• UBIE

• IMO River 1 & 2

• Elelenwo • Assa

• Umuechem

• Updating and Modification of P&ID, G A’s, Equipment Layouts and Isometrics. Civil & Structural

• Hazardous Area Classification

Client

ABB Lummus Global/Shell

1993-1995

Transformation of Design Data to AutoCAD and Archiving

• Process Consultancy Services

• Reprographics

• Material Supply

• Supply of Manpower

• Project Management